What customers say
All-American Solar ServicesSolar design and installation · Riverside, CA
Serving Riverside and nearby towns
Riverside, California
All-American Solar Services is a solar upgrade and installation service for Riverside homes on Riverside Public Utilities (RPU). It would check your billing agreement first, then price inverter, panel and battery work on separate lines, each with the tariff it leaves you on, so a repair doesn't end your NEM agreement by accident.
Get your free quote Run the upgrade check
Private website concept. All-American Solar Services is shown here as a proposed upgrade service, not an operating company.
Riverside, California
All-American Solar Services works on solar in Riverside and the Inland Empire: new arrays, and the systems installed a decade ago that the original company will not come back for. We read your utility agreement first, then price inverter, panel and battery work apart.
What customers say
Serving Riverside and nearby towns
What we do
Call or visit
| Phone | (800) 291-8522Call to book an assessment. |
|---|---|
| Office | 4193 Flat Rock Rd, Riverside, CA 92505Parking on site. |
| Estimates | Free, in writingDesign and price as separate documents. |
Why homeowners pick us
Our story
Servicing and installing across Riverside, Corona and the Inland Empire.
Where we work
Pick the utility named on your bill, your original system size and the change you want. The check shows the growth limit that utility publishes for older net energy metering (NEM) agreements and what to ask it in writing.
A screening aid only. Each utility decides how its own rule applies to your system. Everything runs on this device; nothing is sent or stored.
Corona addresses are served by SCE or by Corona Utilities. Check the name on your bill.
24% of the original
Inside RPU's 25% limit
Schedule NEM continues if RPU measures the 25% on DC nameplate.
Ask RPU in writing: is the 25% measured on DC nameplate or AC rating, and do earlier additions count?
Before you approve an inverter swap, more panels or a battery, find out which billing agreement your system is on and what would end it. On an older Riverside system, that agreement often decides which option makes sense, so check it before anyone prices hardware.
RPU counts more than 4,700 Riverside homes and businesses with solar. If your system's permit was completed by October 31, 2022, it's likely on RPU's Schedule NEM (net energy metering). Under NEM, the power you send to the grid offsets the power you buy, netted over a 12-month period. If you export more than you use over that year, RPU pays the surplus at a set rate: $0.077 per kWh for 2026.
Schedule NEM closed to new customers on November 1, 2022. If you're already on it, you keep it until one of four things happens:
Triggers two to four come from RPU's Schedule NEM itself. The first comes from RPU's web page, which says customers are not affected "unless they replace their system". Neither document defines "replace", so whether swapping only a failed inverter counts is the first question to put to RPU in writing, before anyone orders equipment.
You can also leave NEM by choice at any time; that switch is permanent.
The successor program is Self-Generation (Self-Gen). Homes go on the D-TOU time-of-use rate, and exports are credited at RPU's avoided cost of energy, which sits well below the price you pay for power you buy (the battery section shows both). If you sell a NEM home, the buyer doesn't inherit NEM: RPU's Self-Gen page says the new customer is placed on the Self-Generation rate automatically.
One correction: some directories list "Net Billing (NEM 3.0)" as Riverside's rule. According to the CPUC, that state tariff applies to new PG&E, SCE and SDG&E solar customers from April 15, 2023. RPU is city-owned and writes its own rules.
Two terms first. kW DC is the panels' rated output added together, the "nameplate". The inverter's AC rating is what it delivers to your house as alternating current, usually less than the DC total. RPU's schedule doesn't say which one the 25% is measured against, and an upsized inverter can grow the AC figure without adding a single panel.
| Upgrade | Tariff after the change | Confirm in writing with RPU |
|---|---|---|
| Same-size inverter (like-for-like: same AC rating) | Stays on NEM, unless RPU treats it as "replacing the system" | That an inverter-only swap is not a system replacement |
| Larger inverter (higher AC rating) | NEM if the increase stays at or under 25%; Self-Gen above it | Whether the 25% is measured on DC nameplate or AC rating |
| Panels adding up to 25% | Stays on NEM | The basis (DC or AC), and whether an earlier addition counts toward the same 25% |
| Panels adding more than 25% | Self-Gen on D-TOU; exports credited at avoided cost | Your Self-Gen sizing limit (up to 150% of historic yearly use) |
| Battery with RPU's storage rebate | Self-Gen on D-TOU, required by the rebate | Your rebate application date and fund availability |
A battery without the rebate is the open case: the documents don't say whether it keeps you on NEM, so ask RPU.
This table is RPU's. Some unincorporated pockets near the city edge may be on Southern California Edison, so check the name on your bill. SCE's test differs: NEM customers can generally grow by the greater of 1 kW or 10%, and a sale doesn't end the NEM term (see the Norco page). For an SCE inverter swap, the like-for-like route is on the Jurupa Valley page.
How we work. The work would start at a desk, not on a ladder: an agreement check that names your tariff, the triggers that would end it, and the questions to send RPU. Then an on-site assessment of about 90 minutes (Illustrative duration).
Pick the row that matches your situation. Each one starts with the same agreement check.
| If you need | We | The tariff question it answers first |
|---|---|---|
| A failed or aging inverter replaced | Quote a same-size inverter, and a larger one only if it helps | Does RPU treat an inverter-only swap as replacing the system? |
| More production for an EV, heat pump or pool | Price added panels on their own line, sized against the 25% threshold | Does the addition stay at or under 25% of the original system? |
| A battery | Price storage on its own line, with the rebate trade-off shown | Is RPU's rebate worth the move to Self-Gen D-TOU? |
| A first solar system | Quote a new system for RPU's Self-Gen program | How large it may be (up to 150% of historic yearly use) and what exports earn |
Coverage of Riverside and nearby towns is and has not been confirmed.
How we work. Before you sign anything, you'd hold five documents:
The bill estimate needs your real usage. Without 12 months of data, nobody can fill that column honestly. Here's an option sheet for one home.
Illustrative example. A Riverside home has a 5.0 kW DC system, permitted in 2019, on Schedule NEM. The string inverter has failed. The owners have bought an electric car and want more production.
Option Scope kW DC change Tariff after the change Confirm with RPU first A Same-size inverter only 0 NEM Inverter-only swap is not a "system replacement" B Same-size inverter plus three 400 W panels +1.2 kW (24%) NEM, if RPU measures on DC nameplate DC basis, and that A's answer still holds C New inverter plus four 400 W panels +1.6 kW (32%) Self-Gen on D-TOU Self-Gen terms and the 150% sizing cap Option B adds production under the threshold, if both written answers come back right. Option C adds the most and gives up NEM. Either can be the right call. The option sheet's job is to show which agreement you'd be on afterwards before you sign.
Four things move an upgrade's price.
Property tax has its own date. California's new-construction exclusion for active solar systems is scheduled to sunset on January 1, 2027, according to the Board of Equalization. The Board's page doesn't say how additions to an existing system are treated, so ask the Riverside County Assessor before setting an install date. This isn't tax advice.
Only the added-panel line can fairly be measured in dollars per watt. Divide its price by the DC watts it adds.
Illustrative calculation · added-panel line on an RPU NEM home. Same 5.0 kW DC system: 25% is 1.25 kW of headroom. Three 400 W panels add 1.2 kW (24%), under it; four add 1.6 kW (32%), over it, if RPU measures DC nameplate. Suppose the expansion line quotes $5,400 for the 1.2 kW: $5,400 ÷ 1,200 W = $4.50 per added watt.
State benchmark: EcoGen's Solar Cost Index puts California at $2.85 per watt for a whole new system (September 2026 Edition, prices as of September 25, 2026, solar only).
That's well above the benchmark, which alone doesn't prove a bad deal. The index is a modeled installed price before incentives for a representative full system, not a quote. A 1.2 kW add-on spreads fixed permit, design and paperwork costs over far fewer watts.
Ask the installer to itemize those fixed costs, then divide what's left (panels and racking) by the added watts. If that's still far above $2.85, ask why.
Don't compare an inverter or battery line with $2.85 per watt. Neither adds solar watts, and the benchmark covers solar only.
RPU's Energy Storage Rebate pays $500 per kWh of storage, up to $10,000. Customers in RPU's SHARE program get $850 per kWh, up to $17,000. The battery must be customer-owned, purchased on or after July 1, 2026, and the application must go in within 180 days of purchase. Funding isn't reserved; check availability before you buy.
The rebate has a condition. Existing NEM customers who take it must transfer to Self-Gen on D-TOU.
Illustrative calculation · battery with the RPU rebate. A 13.5 kWh customer-owned battery bought after July 1, 2026: 13.5 × $500 = $6,750 rebate, under the $10,000 cap. Claiming it moves a NEM customer to Self-Gen D-TOU, where a summer on-peak export earns 9.95¢ per kWh (RPU's July 2026 to June 2027 rate), while summer on-peak power you buy costs 23.04¢ (Tier 1) to 36.86¢ (Tier 2) per kWh. Under NEM, exports net against imports over 12 months, and any yearly surplus earns 7.7¢.
On D-TOU, summer (June 1 to September 30) on-peak is 2 to 7 p.m.; winter on-peak is 4 to 9 p.m. Tier 1 and Tier 2 are the lower and higher price steps in RPU's D-TOU schedule.
So the trade is a one-time rebate against a different yearly bill, and the bill depends on when your house uses power and when your panels produce. Ask for the bill under each tariff, built from your 12 months of data, before you sign. If a quote shows the rebate but not the tariff change, it leaves out the part that affects every bill after it.
Most upgrades on an existing system take the City's standard permit route, not the fast lane. The City runs SolarAPP+, an automated online permit for simple rooftop solar, through its Public Portal. The SolarAPP+ fee is $25, plus the City's solar permit fee. But the City's page excludes projects with:
An inverter swap, expansion or battery on an older system hits at least one exclusion, which leaves the standard Building & Safety permit. Ask Building & Safety for that route's checklist and fee for your job, or have the installer show you the submittal before work starts. Newer tract systems in nearby SolarAPP+ cities raise different questions, covered on the Eastvale page.
The same page lists RPU's requirements: a lockable, visible-break, non-fused AC disconnect, and production no more than 150% of historical yearly use. Ask whether your existing disconnect qualifies.
Contractors need a City Business License and a state contractor's license, usually a C-46 (solar) or C-10 (electrical) for residential solar. Look the number up on the CSLB license check before you sign.
If your home is a designated historic resource or in a historic district, it falls outside SolarAPP+. Talk to City Planning before any design work, and ask whether the change needs a Certificate of Appropriateness.
Don't switch an upgraded system back on until RPU's process says you can. RPU's All About Solar page sets out the sequence:
The City does not issue an official PTO letter. For PTO in writing (for your records, a lender or a buyer), email RPU. Status also shows on the City's Solar Map.
For an upgrade, that written PTO is your record of the scope RPU accepted. Check that it matches what your tariff status letter said would happen.
An upgraded system has parts of two ages. Settle who stands behind each before you sign.
Inverters deserve the extra questions. NREL's 2018 PV operations and maintenance best-practices guide notes that 10-year inverter warranties were then commonly available, and that inverter failure is one of the most frequent causes of PV performance loss. If your inverter came with a 10-year warranty and went in before 2016, that warranty has already run out.
Inverter type shapes the upgrade. On a string inverter, panels are wired in series to one central unit, and RPU notes a string performs only as well as its weakest panel; adding panels means checking the inverter can take them. Microinverters sit under each panel, so each added panel normally needs its own; ask whether the new ones work with the old.
After switch-on, RPU's advice: learn your production display, check it at least monthly, and ask about a maintenance contract.
Use this with any solar installer in Riverside, alongside the quote checklist on this site.
Ask RPU in writing
Ask the installer
Red flags
Can I still get the 30% federal tax credit on an upgrade? No. The 25D credit isn't available for property placed in service after December 31, 2025, so 2026 inverters, panels and batteries don't qualify.
What does a new solar system cost in Riverside? As a state benchmark, EcoGen's Solar Cost Index (September 2026 Edition) puts California at $2.85 per watt, or $19,095 for a 6.70 kW system, before incentives, solar only, with any battery priced separately. Your own quote depends on system size, roof condition and main panel capacity, and no 25D credit applies in 2026.
Does NEM 3.0 apply to my Riverside home? Not if RPU is your utility. RPU runs Schedule NEM for legacy systems and Self-Gen for new ones.
If I sell my house, does the buyer keep NEM? No. Under RPU's rules, a new customer at a NEM address goes on Self-Gen automatically. SCE treats a sale differently.
I don't have solar yet. Would we help? Yes, as a secondary path. A new RPU system goes on Self-Gen D-TOU, sized up to 150% of historic yearly use, with exports credited at avoided cost. Separate lines, price per watt and written PTO still apply.
Is this the same business as other "All American Solar" names in search results? Several solar businesses use similar names. All-American Solar Services, as described here, is a upgrade service for Riverside homes. Whoever quotes you, check that the business name on the contract matches its CSLB license record.
I'm in Corona. Is it the same? No. Corona addresses are served by either SCE or the city's own utility, a third rulebook covered on the Corona page.
The utility on the bill decides which upgrade rule applies. Miles are straight lines from the Riverside listing address, not road miles or a service limit. Coverage of these towns is proposed and unconfirmed.
Choose your town and the upgrade you want priced. The site builds a checklist to bring to any installer's quote visit, so every line of the quote can be compared. It runs on this device: nothing is sent or stored.